Quarterly Preventative Maintenance
- Overall system inspections. (Power supplies,
wiring, communications and peripherals)
- Thorough scanner inspection. (Drive belts, pulleys, bearings, lights,
cables, lubricant and prox. switches)
- Verify gauge electronic stability through standardization information.
- Thorough drive motor inspection for signs of excessive wear.
- Perform frame alignment scans.
-
Clean the gauges and verify calibration accuracy.
- Insure the software back-ups are current.
Semi-annual
Preventative Maintenance
- All Quarterly Preventative Maintenance.
- Perform Radiation Safety
checks and wipe test to insure compliance with the Nuclear Regulatory Commission or your states governing
body. We will provide you with a copy of the test and results
for your files.
Annual Preventative Maintenance
- All Quarterly
Preventative Maintenance
- Replace the head carriage roller assemblies.
Emergency Services
- We are able to perform any emergency service your measurement system may require.
- Our promise is to
be on-site within 48 hours of being called. (Typical response time of <24 hours)
- We maintain a thorough inventory
of system spares, and provide them below that of the OEM supplier.
- Should a part be required outside of our inventory,
we will help coordinate the purchase and return shipment of that part.
Training
- While
on-site, we will assist the operators with any training issues that arise.
- We can work with Management on the
development and implementation of several types of training courses for both maintenance and
operation.
Radiation Safety Checks and Testing
- Wipe Tests
- Site
Surveys
- Safety Checks (for Kr-85 and X-ray sources)
- Radioactive Source Leak Tests
- We
will provide you with the results of the tests (of any sort) to keep for your records